Bridge Demolition Postponed
class=”aligncenter size-full wp-image-45829″ src=”http://klax-tv.com/wp-content/uploads/2015/09/trafficonOKAllen.jpg” alt=”trafficonOKAllen” width=”500″ height=”280″ />You may recall we warned drivers about demolition of the main spans of the existing O.K. Allen Bridge over the Red River. We told you the new Curtis-Coleman Bridge would be closed Saturday because of the demolition work.
Turns out, that demolition is postponed. So, the bridge will be open until we hear otherwise from the state highway’s department.
KLAX ABC 31 News 9/17/15