NSU Student Union bridge undergoing repair

Work to repair the Friedman Student Union bridge at Northwestern State University is underway. The driveway under the bridge is closed and there will be limited road closures on Sam Sibley Drive and Caspari Street during the demolition and concrete pouring phase.  Although the downstairs walkway by the book store will not be impacted, the second floor front entrances and the bridge are closed to foot traffic.  The project should be complete by the end of May.  A rendering of the new bridge is on display in the Student Union.