Category Archives: Road Closures

Construction Begins on On, Off Ramps on Pineville Expwy.

Starting tomorrow night, works begins on the southbound off ramp connecting the Pineville Expressway to Highway 165. Also, work begins on the northbound entry ramp connecting Highway 28 East to the Expressway.
Closures can be expected from 10 pm to 5 am tomorrow and Friday morning. Then, the ramps close again Friday night at 10 and [...]

Road Closure: LA1177 in Avoyelles Parish

Route: LA 1177; Rapides Parish
LA 1177: Avoyelles Parish- JCT. US 71
S.P. No. H.009516; Control Section No. 840-18
The Louisiana Department of Transportation and Development (DOTD), advises the public that weather permitting, on Tuesday, October 7, 2014 road construction work will begin on LA 1177 from the Avoyelles Parish line to its junction with Route US 71.
This [...]

New Traffic Patterns Begin Tomorrow on Hwy. 165 in Pineville

The traffic pattern on the Pineville side of the Red River between the O.K. Allen Bridge and Pineville High will change tomorrow.
Highway officials say you need to be careful, follow the signs and remember that traffic is reduced to one lane. These are temporary changes while the new bridge is being constructed.
KLAX ABC 31 News [...]

Road Closure: Orleans St in Leesville

Leesville, LAβ€” Please be advised that Orleans Street will be closed from 10:30 a.m. September 9, 2014 through 5:00 p.m. on September 9, 2014 for the repair of a water line.
Questions regarding this matter may be directed to City Hall at 337.239.2444.

Lane Closures: Pineville Expressway

US 167, Purple Heart Bridge – US 165; Rapides Parish; LA;
Project # H.010321;
Control Section 023-01**
The Louisiana Department of Transportation and Development (DOTD), advises the public that beginning Thursday September 4, 2014 at 10:00 PM, construction work will begin on the northbound entry ramp connecting westbound traffic on LA 28 East to northbound US 167 (Pineville [...]

Lane Closure: Texas Avenue, Northbound

City of Alexandria Sidewalks
Rapides Parish, LA
Project # H.010172
The Louisiana Department of Transportation and Development (DOTD), advises the public that beginning Tuesday, September 2, 2014 construction work will require the closure of the northbound lane of Texas Avenue at the Intersection of Texas Avenue and Jackson Street (adjacent to Budget Car and Truck Rental). The work [...]

Road Work to Begin on Jackson Street

Roadwork on Jackson Street begins early Monday between 18th and 20th Streets.
Public work employees are replacing sewer manholes. Detours around the waste-water project will be marked both north and south.
The construction will last about two weeks.
KLAX ABC 31 News 8/15/14

Construction Begins Tomorrow on Pineville Expy

Tomorrow, construction work begins on the Pineville Expressway. Highway officials say the work will be done overnight on the northbound off-ramp connecting the Pineville Expressway to the Shamrock and Downtown Pineville exit.
Construction work will also continue on the southbound off ramp from the Expressway to Highway 28 East.
KLAX ABC 31 News 8/13/14

Lane Closure: Bayou Jean De Jean Bridge

LA 1; Rapides Parish
Milepost 281.36, Bridge # 053-02-0147-1
Control section 053-02
The Louisiana Department of Transportation and Development (DOTD), advises the public that bridge number 053-02-0147-1 will be reduced to one lane for bridge inspection from 9:00 AM until 3:30 PM on August 14, 2014 and August 15, 2014. This structure is on LA 1 over Bayou [...]

Road Work: Purple Heart Bridge at Shamrock Exit

US 167, Purple Heart Bridge – US 165;
Rapides Parish; LA; Project #H.010321;
Control Section 023-01
The Louisiana Department of Transportation and Development (DOTD), advises the public that beginning Thursday August 14, 2014 at 10:00 PM, construction work will begin on the Northbound off ramp connecting US 167 (Pineville Expressway) to the Shamrock / Downtown Pineville Exit.
In addition, [...]

Post Navigation